Quality Magazine
  Home
  Subscribe
  Subscribe to eNewsletter
  Subscription Customer Service
  Online
  Industry Headlines
  eXtras
  Blogs
  Quality Product Spotlights
  White Papers on the Web
  Tech ManufactureXPO
  Quality Downloads
  Webinars
  Quality Showcases
  e-Inserts Plus
  Online Store
  More Product Info
  Archive
  Q-Tube
  Q-Cast Podcasts
  Quality Showrooms
  Brain Teasers
  Current Issue
  Coming Events
  Features
  Departments
  Columns
  Products
  Quality Quick Clicks
  Special Sections
  NDT
  Vision & Sensors
  Aerospace
  How To Guide
  China Editions
  Quality Guides
  Quality Buyers Guide
  Software Selector
  Registrars Guide
  Services Guide
  Quality Services
  Job Marketplace
  Industry Links
  Classifieds
  Career Center
  Events
  Quality Expo 2012
  IMTS 2012
  Meetings and Shows
  Industry Webinars
  Quality Awards
  2012 Quality Plant of the Year Nomination Form
  2012 Quality Professional of the Year Nomination Form
  Quality Leadership 100
  Quality Info
  Media Planning Guide
Search in: EditorialProductsCompanies
Shifting the Paradigm: Enterprise-Process Goal Setting
by Forrest W. Breyfogle III
February 6, 2012

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

To be successful, organizations need to focus on the big picture. One measure of success is that the enterprise’s satellite-level metrics are performing at a level that is considered satisfactory.


This blog will build upon the concepts described in the following previous blogs:

  • A nine-step enhanced business-management system (Integrated Enterprise Excellence –IEE): See Figure 1 in blog Business System Analyses for Identifying Improvement Projects
  • 30,000-foot-level predictive scorecards: See 30,000-Foot-Level Metrics Provide Predictive Scorecards
  • The linkage of 30,000-foot-level predictive scorecards to an organization’s value chain; i.e., how enterprise work is performed and its associated metrics: See Applying 30,000-Foot-Level Predictive Metrics to Business Scorecards

    With the IEE system, satellite-level financial metrics have similar reporting to 30,000-foot-level operational metrics. These metrics can also be linked to the value chain through a "mouse click," as illustrated in Figure 1.





  • To be successful, organizations need to focus on the big picture. One measure of success is that the enterprise’s satellite-level metrics are performing at a level that is considered satisfactory; e.g., mean monthly profit margins as reported in Figure 1. If these financial metrics are not at a desired level, the organization as a whole needs to be assessed to determine which business and process areas need enhancement so that these measurements are most positively impacted.

    Once enterprise-beneficial-improvement areas are identified, the next question is what can be done to ensure timely completion of identified projects, a challenge that exists in many organizations. To address this question, let’s start by examining the following quotes:

    Vince Lombardi changed the National Football League (NFL) Green Bay Packers, who were perpetually losing at the time, into an NFL dynasty. Coach Lombardi said, "If you are not keeping score, you are just practicing."

    Dr. Edwards Deming stated, "If you have a stable system, then there is no use to specify a goal. You will get whatever the system will deliver. A goal beyond the capability of the system will not be reached. . . . If you do not have a stable system, then there is again no point in setting a goal. There is no way to know what the system will produce: it has no capability."

    Dr. Lloyd S. Nelson stated: "If you can improve productivity, or sales, or quality, or anything else, by (e.g.,) five percent next year without a rational plan for improvement, then why were you not doing it last year?"

    To me these quotes suggest that:

  • There are issues with many common-place organizational scorecard systems; e.g., stop-light scorecards.
  • Organizational improvement efforts need to be directly linked to the time-series-tracking enterprise’s scorecards; however, this is not typically done in organizations.

    When organizations establish scorecard goals, much care needs to be exercised. Goals should be SMART; i.e, Specific-Measurable-Actionable-Relevant-Time Based. However, these guidelines are often violated. Arbitrary goals set for individuals or organizations can be very counterproductive and costly.

    The implication of Nelson’s statement is that simple goal setting alone will not yield an improved output. For an enhanced process response, organizations need to give due diligence to bettering the process. Focus needs to be given to the creation of more customers and cash (MC2) not the simple creation of arbitrary goals throughout the organization, which can lead to the wrong activities or strategies that often lead to interpretation and action-item inconsistencies.

    In step two of the nine-step Integrated Enterprise Excellence (IEE) system, satellite-level (financial) and 30,000-foot-level (operational) scorecard/dashboard metrics are examined over time before financial goals are established. The assessment of these non-calendar bounded metrics helps with the creation of SMART goals. This assessment could lead to the following mean monthly satellite-level metric goals within a certain period of time:

  • Sales growth: 10%
  • Operating margins: 16%
  • ROCE (return on capital employed): 20%

    Organizational 30,000-foot-level, value-chain metrics would then be assessed to determine which of these measures would be assigned an improvement goal for the purpose of enhancing the overall satellite-level financial metrics. Performance measurement improvements would be demonstrated by a shift to a new, enhanced level of 30,000-foot-level performance.

    Value-chain metrics need to have a process owner who is held accountable for having any assigned metric-goal-driven process improvement projects timely completed so that their measurement’s targets are achieved. The process owner can expedite the completion of projects in his area, when he works with practitioners in following a consistent roadmap for project execution; e.g Integrated Enterprise Excellence Volume III .

    Organizations can use the IEE system to address not only enterprise-process-goal-setting challenges but overall business management issues, as well.

    References:

    Much of the content in this blog is taken from:

    Integrated Enterprise Excellence Volume II

    Integrated Enterprise Excellence Volume III



  • Forrest W. Breyfogle III
    forrest@smartersolutions.com
    Forrest W. Breyfogle III is founder and CEO of Smarter Solutions Inc. (Austin, TX). For more information, e-mail forrest@smartersolutions.com, call (512) 918-0280 or visit www.smartersolutions.com.

    |PrintEmail
      Comments (0)Post a Comment
     

    No HTML or BBCode in comments please.
     


    Did you enjoy this article? Click here to subscribe to the magazine.
















    Most Emailed Articles

    1. Preventing the Titanic Disaster 100 Years Later
    2. Hardness Testing Market Makes Adjustments
    3. Renishaw Purchases R&R Sales
    4. Quality 101: What Do You Measure in a Lean Organization?
    5. Measurement: The Classic Gage
    6. GD&T Workshop: The Fundamentals of GD&T
    7. Measurement: The Classic Gage
    8. Hardness Testing Market Makes Adjustments
    9. Case Study: Lean Six Sigma Delivers for Pelco Products, Inc.
    10. GD&T Workshop: A Top Down View
    Top Searches
    1. 2011 salary survey
    2. quality performance indicators
    3. Quality Management Systems
    4. Quality 101
    5. root cause
    6. tolerance analysis
    7. quality inspector
    8. key performance indicators
    9. as9100
    10. state of the profession
     
    Most Popular Articles
    1. GD&T Workshop: Decoding Feature Control Frames 05/07/2012
    2. Quality 101: Gage Blocks 05/02/2012
    3. Quality Measurement: Effects of Screw-Thread Geometry 10/01/2005
    4. Jim’s Gems: Paradigms For Personal Growth 05/07/2012
    5. Test & Inspection: A Users’ Guide to Video Extensometers 05/04/2012
    6. Market Analysis: Material Testing Equipment Market: Tried, Tested and Thriving 05/04/2012
    7. Measurement: The Classic Gage 05/01/2012
    8. Quality 101: An Introduction to Gage R&R 12/01/2005
    9. Enhance First Article Inspection 07/16/2007
    10. Quality 101: What Do You Measure in a Lean Organization? 03/08/2012
    © 2010 BNP Media. All rights reserved. | Privacy Policy