Quality Magazine
  Home
  Subscribe
  Subscribe to eNewsletter
  Online
  Industry Headlines
  Web Exclusives
  Quality Product Spotlights
  White Papers on the Web
  Quality Downloads
  Webinars
  Classifieds
  Industry Links
  E-Cards Plus
  Online Store
  More Product Info
  Archive
  Q-Tube
  Current Issue
  Coming Events
  Features
  Departments
  Columns
  Brain Teasers
  Products
  Quality Quick Clicks
  Special Sections
  NDT
  Vision & Sensors
  Aerospace
  How To Guide
  China Editions
  Quality Guides
  Quality Buyers Guide
  Software Selector
  Registrars Guide
  Services Guide
  Events
  Quality Measurement Conference
  Quality NDT Conference
  Quality Expo Detroit
  IMTS 2008
  Quality Awards
  2009 Quality Plant of the Year
  2009 Quality Professional of the Year
  Quality Leadership 100
  Quality Info
Search in: EditorialProductsCompanies
Rockwell Standard Revealed
by James E. Blair
February 22, 2008

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

Hardness testing can be used in a variety of applications. Source: Newage Testing Instruments
Learn more about the ASTM E18-07 hardness testing standard.


The long awaited ASTM E18-07 Rockwell Hardness Standard has been released. While it is technically similar to the older version, some changes affect both users and service providers.

Here is a brief summary of the major changes:


Indenters

An automatic jominy tester with six samples is displayed here. Source: Newage Testing Instruments
All indenters require certifications and serial numbers. In the case of diamond indenters, there are now three classes, each class having different tolerances.

  • Class B diamond indenters are intended for everyday use.

  • Class A indenters are used for standardizing Class B indenters during the manufacturing process, and for troubleshooting by service technicians.

  • Reference diamonds are used to standardize Class A Diamonds.

    In the past, to comply with E18, diamonds were required to have their shape verified on an optical comparator, and then undergo performance verification on test blocks. E18-07 now requires that each indenter have its geometrical attributes (angle and radius) physically measured to ensure compliance. This eliminates the go/no-go measurements allowed by the old standard.

    What this means is that unless a manufacturer has a certification for a given diamond that states that it was physically measured and is compliant with the tolerances for geometry and performance outlined in E18-07, the machine cannot be certified to ASTM E18-07.

    Indenter balls and indenter holders also will require independent certification, with indenter holders demonstrating that the indenter holder was performance verified, and that there is at least 0.3 millimeter protrusion of the ball from the ball cap. The indenter balls are certified for diameter, material and hardness. The new standard also ties an indenter to a machine. This means that an indenter must be verified, using an abbreviated indirect verification, and tied by serial number to a given machine, before it can be used to measure parts. The indenter must be verified on two test blocks for each scale that it is intended to be used on— for example, HRA, HRC or HR15N. A certificate, similar to the ones generated when a machine is certified, must be generated and kept. Users are allowed to perform this verification themselves.


  • Direct Verifications

    This shows an inline automatic tester. Source: Newage Testing Instruments
    Direct verifications are a means of inspecting individual critical attributes of a hardness tester. In a Rockwell hardness tester that includes measuring the force at preload, total force and force at elastic recovery (the reading position). The displacement measuring device must be isolated and verified. Additionally, the timing and machine hysteresis must be verified.

    Direct verifications have always been done by testing machine manufacturers when machines are manufactured. They also were performed when machines are rebuilt, and as a diagnostic tool when the force, or measuring systems are suspect. The new standard now states a direct verification (less the timing) must be performed “When adjustments, modifications or repairs are made that could affect the application of test forces, the depth measuring system or the machine hysteresis.”

    To comply with E18-07, if adjustments are made that affect any of these key elements, service technicians can no longer just rely on performance of the machine on test blocks. A direct verification must be done to ensure that all of these elements are in tolerance, and are not simply correct by “canceling errors.”

    In other words, there may be cases where an instrument reads the test blocks within tolerance, but fails a direct verification. Under the new revision, these machines cannot be deemed “certifiable” unless the machine can be adjusted/repaired to pass both a direct and an indirect verification.


    As Found Results

    Rockwell indenter shows a closeup of the hardness test. Source: Newage Testing Instruments
    The old revision of E18 was rather ambiguous regarding service technicians reporting as found results. E18- 07 now states that as found results must be obtained and recorded for every scale that is to be recertified. Historically, as founds were taken on the scale on which the machine was “as found.” This is a time-consuming process, not to mention the additional test block consumption, which may force providers to adjust their service pricing.


    What Can You Do in the Interim?

    If you are not prepared to meet the new revision of E18, service technicians can certify your instruments in accordance with ASTM E18-05, which is the previous version. Many companies are switching but the change is not yet universal. Q


    Tech Tips

  • To comply with E18-07, if adjustments are made that affect any of these key elements, service technicians can no longer just rely on performance of the machine on test blocks.

  • A direct verification must be done to ensure that all of these elements are in tolerance, and are not simply correct by “canceling errors.”

  • There may be cases where an instrument reads the test blocks within tolerance, but fails a direct verification. Under the new revision, these machines cannot be deemed “certifiable” unless the machine can be adjusted/repaired to pass both a direct and an indirect verification.


  • James E. Blair
    James E. Blair is the marketing manager at Newage Testing Instruments (Southampton, PA). For more information, call (800) 806-3924, e-mail info@newage1.com or visit www.hardnesstesters.com.


    Did you enjoy this article? Click here to subscribe to the magazine.



















    Most Emailed Articles

    1. Dispelling the Myths of ISO 9001
    2. Quality 101: Improving Quality Through Lean Concepts
    3. Understanding ISO 13485
    4. Quality 101: Surface Finish Measurement Basics
    5. Understanding ISO 13485
    6. What’s in a Name: Accreditation vs. Certification?
    7. Quality 101: Tracking Gage Calibration with a Spreadsheet
    8. Manufacturing Excellence: Excel in the Quality Department
    9. Calibrating Correctly
    10. Adding Value for True Position Measurement
    Top Searches
    1. Quality 101
    2. quality questions
    3. TRUE POSITION + STATISTICS
    4. Manufacturing and ISO 9000
    5. process capability
    6. material trace
    7. lean
    8. tracing raw material
    9. ogp
    10. ISO 9001
    Most Popular Articles
    1. Understanding ISO 13485 01/02/2008
    2. Case Studies: Proper Training Secures Product Quality 07/31/2008
    3. Manage Metrology Documentation 07/31/2008
    4. Quality 101: Surface Finish Measurement Basics 09/01/2004
    5. Quality 101: Improving Quality Through Lean Concepts 11/21/2007
    6. Dispelling the Myths of ISO 9001 06/27/2008
    7. Thermo Fisher Scientific Receives R&D Award 08/04/2008
    8. What’s in a Name: Accreditation vs. Certification? 06/02/2008
    9. Automotive Initial Quality Makes Considerable Improvements 07/31/2008
    10. Case Studies: Improve Foreign Supplier Quality 07/31/2008
    © 2008 BNP Media. All rights reserved. | Privacy Policy