Brain Teasers: Can You Solve the Final Brain Teaser?

Congratulations to Bob Fischnich, manager, corporate compliance and quality development at The Schnipke Engraving Co. Inc. (Ottoville, OH) on solving the final Brain Teaser and winning the Kindle.

Thank you to all those who participated.

Answers to the final Brain Teaser will follow later this week.



After 10 years of writing Brain Teasers, Dr. Sophronia Ward is taking a break from her monthly column to write several books. In celebration of the success of this column, Dr. Ward and her colleagues at Pinnacle Partners want to give you the opportunity to solve this final Brain Teaser. They are generously sponsoring a contest to see who can provide the best solutions using the tools and techniques that have been discussed during the past 10 years. Your answers should be brief-no more than 5-10 sentences per question. These answers should be supported by the analysis that you have done. Graphics may be included to prove your statements. E-mail your answers to brainteasers@qualitymag.com. Deadline is January 15, 2010.



See how much you have learned during the past 10 years and have a chance to win one of three great prizes for your efforts.

  • First prize: Kindle (international version)

  • Second prize: Set of three Pinnacle Partners-authored books

  • Third prize: One Pinnacle Partners-authored book

    A random drawing will be conducted to determine the winners from all correct entries. Answers and winners will be posted to www.qualitymag.com by February 1, 2010.




  • Situation

    Myra and Tracy are process engineers in the component machining area of a company that manufactures medical devices for hospitals, clinics and doctor’s offices. One specialty product is a pump that is widely used in these areas. In the past week, the first pass yield for the outside diameter of an impeller in the pumps has decreased enough to be noticed by Henry, the production manager. Henry then sent an e-mail to Myra and Tracy to determine what is going on with these impellers.

    According to capability analyses conducted prior to full production, the outside diameter had a Cpk of 1.4. However, this Cpk has never been realized in full production because, until recently, the first pass yield has averaged just below 99.5%. The specifications for outside diameter are 2 inches ± 0.004 inch. Myra and Tracy held a meeting with the supervisors and operators in component machining to discuss the decrease in first pass yield and determine why the impeller is failing on outside diameter. During this meeting they were informed that the actual values for outside diameter were shown on the display for the measuring instrument, but not recorded in the computer. Only the first pass yield is available for analysis.

    Available Data

    Myra and Tracy enlisted the assistance of one of the plant computer technicians to capture the actual outside diameter of each impeller that was measured. There are two lines that machine these impellers and every hour two impellers are diverted to a measurement station. The outside diameters for both impellers for each line are summarized in the table, “Outside Diameter for Impellers.” Also, data for first pass yield is provided in the table, “First Pass Yield for Impellers.”

    Questions

    1. Based on the first pass yield available for November, is there evidence to support Henry’s observations that first pass yield has decreased? Provide compelling analysis to support your answer.

    2. What is the process behavior of the outside diameter for these impellers for the time period provided?

    3. Does the process behavior for the outside diameter help explain the decrease in first pass yield?

    4. What specific actions need to be taken based on the process behavior of the outside diameter of these impellers to improve first pass yield?


    Answers to November Brain Teaser

    Leslie, the customer quality manager, has started receiving complaints from a customer about a valve that leaks when the customer tests the finished product that uses this valve. The quality records revealed that there were leak values above the maximum of 10-6. Leslie has requested actual leak values instead of the typical pass/fail data to determine what could be the root cause of the leaks in the customer’s product.



    Q: Do all of the leak values meet the specification?

    A: No, there are five leak values above the maximum required for these valves.



    Q: What is the process behavior for this valve?

    A: The leak values for this valve are unpredictable over the two weeks of data provided. There are points outside the limits on both the average and range charts. There also is a pronounced zigzag pattern on the average chart. See the chart, “Average and Range Chart for Leaky Valves.” Further investigation of this pattern suggests that it is connected to the different shifts. The average and range chart of the Day Shift shows an unpredictable process with points outside the limits on both the average and range charts. The analysis for the Night Shift shows a predictable process. See the chart, “Average and Range Chart for Leaky Valves by Shift.”



    Q: What is the capability of the leak values for this valve?

    A: Since the day and night shifts have different behaviors, capability should be reported separately for each shift. Because the day shift has an unpredictable behavior, calculations of capability are unreliable. Often, a worst-case scenario for capability in this case is calculated as Ppk which is 0.63. However, none of the leak values are above the maximum specification. For the night shift, Cpk equals 0.33 and 25% of the leak values are above the maximum specification. See the graph, “Capability Analysis for Leaky Valves: Night Shift.”



    Q: If this process needs improvement, what is the initial focus for improvement?

    A: Both the day shift and night shift need to improve their processes; however, the approach and actions necessary for improvement are different for each shift because their process behaviors are different. Day shift needs to find the causes of the exceptional variation indicated by the points outside the limits and remove these causes of variation from their process to achieve predictability. They have a potential of achieving a Cpk of 1.09 if they are successful. Night shift already has a predictable process, but 25% of the valves do not meet specification. Night shift needs to lower the process average to a maximum of 0.70 to prevent leak values from exceeding the maximum specification.

    Did you enjoy this article? Click here to subscribe to Quality Magazine. 

    Dr. Sophronia Ward is a continual improvement specialist and Six Sigma Senior Master Black Belt and Coach. Brain teasers are now incorporated in the new training programs, Six Sigma Training for Champions, Black Belts and Green Belts, offered by Dr. Ward and her associates at Pinnacle Partners Inc. For more information, call (865) 482-1362 or visit www.pinnaclepartnersinc.com.

    Recent Articles by Dr. Ward

    You must login or register in order to post a comment.

    Multimedia

    Videos

    Podcasts

    Bill Arbogast explains his perspective on quality, ISO 9001, and how to manage inevitable business changes.


    Read: The 2013 Quality Professional of the Year

     
    More Podcasts

    THE MAGAZINE

    Quality Magazine

    magazine quality cover 2013 may audits

    2013 May

    Check out the May 2013 edition of Quality Magazine for features about Measurement, Software and Test & Inspection.
    Table Of Contents Subscribe

    Plant of the Year

    Which is the most important factor in considering a Quality plant of the Year?
    View Results Poll Archive

    THE QUALITY MAGAZINE STORE

    M:\General Shared\__AEC Store Katie Z\AEC Store\Images\Quality\prac-field-guide-for-iso.gif
    A Practical Field Guide for ISO 9001:2008

    The purpose of this field guide is to assist organizations, step by step, in implementing a quality management system (QMS) in conformance with ISO 9001:2008, whether from scratch or by transitioning from ISO 9001:2000. It examines each sub-clause of Sections 4–8 of ISO 9001:2008, which contain the requirements, and gives a list of the documentation/documents required, internal audit questions, a summary of management’s responsibilities, and a flowchart of the steps that need to be undertaken to satisfy the requirements.

    More Products

    Clear Seas Research

    qcast_ClearSeas_logo.gifWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

    eNewsletters

    STAY CONNECTED

    facebook_40.png twitter_40px.png  youtube_40px.pnglinkedin_40px.png