The Navy plans to purchase 108 P-8As to replace its fleet of P-3C aircraft. Initial operational capability is slated for 2013. The P-8A will provide increased capability in long-range anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance.
The next major P-8A assembly milestone will be engine installation. The Boeing-led Poseidon industry team remains on track for delivery of the first test aircraft to the Navy in 2009. Under the current contract, the team will build five test vehicles: three flight-test and two ground-test aircraft.


More








