Industry Headlines

Nissan Announces Senior Leadership Appointment for New Plant in Brazil

FRANKLIN, TN-Nissan Americas today announced that Atsuhiko Hayakawa, currently vice president and general manager of Nissan's manufacturing operations in Yokohama, Japan, has been named vice president, Manufacturing Operations, Nissan Brazil, effective Jan. 1, 2012. In his new role, Hayakawa will oversee the new production facility Nissan will build in Resende, in the Brazilian state of Rio de Janeiro, which was announced last month. He will report to Bill Krueger, vice chairman, Nissan Americas, and Hidetoshi Imazu, executive vice president, Manufacturing and Supply Chain Management, Nissan Motor Co., Ltd.

"Hayakawa-san's Nissan career has perfectly prepared him to launch our Resende plant," said Krueger. "In his current role at our production site in Yokohama, he has led his team to benchmark-level quality, cost and time performance. As we continue to strengthen Nissan's presence in Brazil, we expect to benefit significantly from Hayakawa-san's manufacturing expertise and strong management skills."

Hayakawa joined Nissan in 1982 and, since then, has held positions of increasing responsibility in engine and production engineering, and production management, including an assignment at Nissan Mexicana from 1994 through 1997. From 2004 to 2006, he was a Powertrain program director with responsibility for V6/V8 engines used in models such as the Infiniti G and Nissan Titan, including the VQ engine that was named to Ward's 10 Best Engines list for 14 consecutive years. He has a bachelor's degree in mechanical engineering from Waseda University.

Nissan's Resende facility, scheduled to begin production in the first half of 2014, will have the capacity to produce 200,000 units annually of Nissan's 'V' platform products and will directly create up to 2,000 jobs. The new plant is anticipated to become a key enabler of Nissan's growth strategy for fast-growing BRIC (Brazil, Russia, India and China) markets and expands on Nissan's current capacity in the state of Parana. That existing facility will continue to produce Nissan Livina and Frontier models.

Did you enjoy this article? Click here to subscribe to Quality Magazine. 

You must login or register in order to post a comment.

Multimedia

Videos

Podcasts

Bill Arbogast explains his perspective on quality, ISO 9001, and how to manage inevitable business changes.


Read: The 2013 Quality Professional of the Year

 
More Podcasts

THE MAGAZINE

Quality Magazine

june 2013 magazine cover

2013 June

Check out the June 2013 edition of Quality Magazine for features about Measurement, Software and Test & Inspection.
Table Of Contents Subscribe

Plant of the Year

Which is the most important factor in considering a Quality plant of the Year?
View Results Poll Archive

THE QUALITY MAGAZINE STORE

M:\General Shared\__AEC Store Katie Z\AEC Store\Images\Quality\prac-field-guide-for-iso.gif
A Practical Field Guide for ISO 9001:2008

The purpose of this field guide is to assist organizations, step by step, in implementing a quality management system (QMS) in conformance with ISO 9001:2008, whether from scratch or by transitioning from ISO 9001:2000. It examines each sub-clause of Sections 4–8 of ISO 9001:2008, which contain the requirements, and gives a list of the documentation/documents required, internal audit questions, a summary of management’s responsibilities, and a flowchart of the steps that need to be undertaken to satisfy the requirements.

More Products

Clear Seas Research

qcast_ClearSeas_logo.gifWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

eNewsletters

STAY CONNECTED

facebook_40.png twitter_40px.png  youtube_40px.pnglinkedin_40px.png