Quality Magazine logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Quality Magazine logo
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
    • SUBMIT YOUR PRODUCT
  • CHANNELS
    • AUTOMATION
    • MANAGEMENT
    • MEASUREMENT
    • NDT
    • QUALITY 101
    • SOFTWARE
    • TEST & INSPECTION
    • VISION & SENSORS
  • MARKETS
    • AEROSPACE
    • AUTOMOTIVE
    • ENERGY
    • GREEN MANUFACTURING
    • MEDICAL
  • MEDIA
    • A WORD ON QUALITY PUZZLE
    • EBOOK
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • EVENTS
    • EVENT CALENDAR
    • IMTS
  • DIRECTORIES
    • BUYERS GUIDE >
      • Supplier Insights
    • NDT SOURCEBOOK
    • VISION & SENSORS
    • TAKE A TOUR
  • INFOCENTERS
    • Digital Quality Management Systems
    • NEXT GENERATION SPC & QUALITY ANALYTICS
  • AWARDS
    • ROOKIE OF THE YEAR
    • PLANT OF THE YEAR
    • PROFESSIONAL OF THE YEAR
  • MORE
    • Expert Columns
    • NEWSLETTERS
    • QUALITY STORE
    • INDUSTRY LINKS
    • SPONSOR INSIGHTS
  • EMAG
    • eMAGAZINE
    • ARCHIVES
    • CONTACT
    • ADVERTISE
  • SIGN UP!

QUALITY SOFTWARE & ANALYSIS: Optimize Coordinate Metrology on the Shop Floor

By Anna Maria Izzi
April 18, 2006
Many CMM manufacturers provide turnkey measuring systems that optimize the floor-to-floor cycle at various automation and integration levels. Source: Hexagon Metrology


The primary reason for installing and operating coordinate measuring machines (CMMs) on the shop floor is to keep process quality under control, preventing the production of defective parts.

Time is a critical factor. To reduce measurement time to a minimum, only the most critical features should be inspected in a typical process control operation. Nearly all CMMs feature good dynamics and are able to perform positional moves and pick up points very quickly. As a result, measuring programs generally require a short execution time.



A simple, manual system can be used on small- to medium-sized measuring machines. These systems consist of a base plate permanently fixed to the CMM bed. Source: Hexagon Metrology
The measurement cycle itself represents only a small part of the time required to execute the "floor-to-floor cycle"-from collection and loading of parts on the CMM to their removal once inspection is completed. It's not uncommon to find situations in which the loading/unloading operations take considerably longer than the measurement cycle.

Some CMM manufacturers provide turnkey measuring systems that optimize the floor-to-floor cycle at various automation and integration levels. These measuring systems normally include the CMM, loading/unloading systems, fixtures and software. They are specifically designed and built to meet the technical requirements of various applications depending on the type of parts to be measured, part weight, sampling rate, specific production, and the economic requirements of small, medium and large firms.



This dedicated fixture is for a family of parts. Source: Hexagon Metrology

Part fixtures for dimensional control

Accuracy and reliability of measurement on the shop floor may be affected by several factors. Environmental factors such as temperature, vibrations airborne contaminants, material type and the machining process itself all influence the reliability of measurement results. Incorrect positioning of the part on the measuring machine may also lead to incorrect measurement. As a rule, parts to be measured need to be mounted on suitable fixtures. These fixtures must:
  • Ensure repeatable positioning of the part both in the measurement volume and on the fixture itself.
  • Allow quick loading of the part.
  • Ensure part stability during the measurement cycle.
  • Allow access to all features to be measured.
  • Prevent damage or deformation of the parts.

In the case of free-form parts with low rigidity, such as sheet metal panels, fixtures also have to force the part to take on its nominal geometry. For this reason, fixtures for car body components are generally more complex than those for mechanical, prismatic parts. The choice of the right fixture is critical for reliable results and to minimize part change time.

Fixtures for measurement and inspection operations come in two general types:

  • Dedicated fixtures specifically built for a given part or family of parts.
  • Modular fixtures that are reconfigurable and can be re-used on several parts since they are made of modular elements. A fully flexible fixturing system that can be reconfigured in few minutes.


Two pallets allow the operator to prepare a new part for inspection while the measuring machine is performing the inspection operation on another piece. Source: Hexagon Metrology

Loading/unloading systems for metrology applications

The loading/unloading systems that are the core of every integrated measuring system can be subdivided into these categories:
  • Manual systems
  • Semi-automatic motorized systems in which every function has to be activated by the operator
  • Automatic systems that require no operator involvement

Depending on the workload of the CMM, these systems may be configured with a single, double or multiple pallet. CMMs integrated into production lines generally have highly automated workhandling systems.

A simple, manual system is generally used on small- to medium-sized measuring machines to quickly replace the pallets. These systems consist of a base plate permanently fixed to the CMM bed. The plate mounts three spheres ensuring highly repeatable isostatic support onto which the operator places the pallet. Plates and pallets are available in various sizes to suit different types of parts. Both dedicated and flexible fixtures can be mounted onto the pallet.

If part handling is difficult due to part weight, but the part is not heavy enough to require the use of an automated system, the pallet may be pushed instead of lifted by the operator by means of a transfer system on roller guideways. This solution allows the operator to perform pallet or part change in a comfortable and ergonomic position, even where access is restricted, such as when the CMM is inside a cell. When needed, two pallets allow the operator to prepare a new part for inspection while the measuring machine is performing the inspection operation on another piece.

Motorized single-pallet loading/unloading systems also are used frequently to position very heavy parts on the CMM. In this way, damage is prevented to the bed or to the CMM itself. This solution is often used for loading parts on CMMs located inside enclosures. Typically, these systems allow accurate positioning, repeatability of the pallet and a cycle time of less than one minute, excluding measuring time. If it is necessary to further reduce the floor-to-floor cycle time, similar systems are also available in double-pallet and multiple-pallet versions.

With these types of systems, it is necessary for the operator to be close to the measuring machine each time the part has to be replaced. If the CMM workload is high and the measurement cycle is relatively short, the operator must be present at all times. If an operator has to be employed at several workstations, multiple-pallet systems are generally used. These systems allow loading a number of parts in a single stage, even parts of different types. Once the inspection cycle begins, the measuring machine automatically performs the inspection of parts in the order given.

Loading/unloading systems can have multiple pallet and linear transfer. For logistics requirements, an alternative system might be a multiple-pallet solution on rotary table.

Another inexpensive solution is to create a buffer of parts to be measured, represented by closed-loop loading/unloading systems. This system is very simple to use and has the advantage of minimum required floor space. It can be used for a large variety of parts because it is suitable for components weighing a few ounces to 500 lb.

There can be direct integration between the measuring machine and a numerically-controlled lathe. A bridge robot handles the movement of the parts between the two operating units. In these cases, measurement data is used to correct the machine tool in real time. Software processes the measurement results and calculates the machining program corrections to account for tool wear or misalignment.

There is a close interaction between the measuring machine and the other operating units (in this case, a lathe, a machining center and a dedicated machine tool) in a flexible manufacturing cell (FMC). A mechanical gripper mounted on a rail picks up incoming parts from a motorized conveyor and moves them from one workstation to another. Based on the data obtained from the CMM operating software, the mechanical gripper deposits the parts back on the conveyor, or in a scrap bin.

A by-pass system can be integrated in the main line for manufacturing prismatic components. Among the key elements of this turnkey system supplied by a CMM manufacturer are:

  • Stop and synchronize devices for the parts on the key conveyor.
  • Transfer units from or to the conveyor.
  • Part fixtures.
  • The measuring machine in an air-conditioned enclosure.
  • System operating software handling all automation activities of the inspection cell and its interaction with the manufacturing line.


Operating software typically is customized to the specific application and can provide the operator with a simple and intuitive graphic interface, information in real time on system status and on the quality of the measured parts. Source: Hexagon Metrology

Process management for turnkey measuring systems

Unlike installations with a standard measuring machine in which only traditional CMM activities need to be coordinated, the synchronization of loading/unloading systems must be managed. Although it isn't a prerequisite, it's better to separate the handling of measurement and inspection activities from automation activities in order to maintain optimum control of the two activities.

As a result, turnkey measuring systems usually have specific software that controls all automation devices and synchronizes their activities with those of the measuring machine. In case of high-level integration, the software also interacts with other programs, typically production line software.

Operating software is generally customized to the specific application and is able to provide the operator with a simple and intuitive graphic interface, information in real time on system status and on the quality of the measured parts.



Sidebar: Quality Tech tips

  • Accuracy and reliability of measurement on the shop floor may be affected by several factors.
  • In the case of free-form parts with low rigidity, such as sheet metal panels, fixtures also have to force the part to take on its nominal geometry.
  • Separate the handling of measurement and inspection activities from automation activities in order to maintain optimum control of the two activities.


Links

  • Hexagon Metrology

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Anna Maria Izzi is a product manager at DEA (Torino, Italy), a Hexagon Metrology company. She can be reached at [email protected] or + 39 011 4025380. For more information, visit www.hexmet.co.uk

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2024 Quality Rookie of the Year Justin Wise 1440x750px banner with "Quality Rookie of the Year" logo inset

    Meet the 2024 Quality Rookie of the Year: Justin Wise

    Justin Wise is an exceptional individual who has been...
    Aerospace
    By: Michelle Bangert
  • Man with umbrella and coat stands outside while it rains at night looking at a building.

    Nondestructive Testing: Is there an ethics problem?

    I was a whistleblower who exposed fraudulent activities...
    NDT
    By: Dale Norwood
  • Unraveling Deflategate: Football stadium with closeup of football on field

    Unraveling the Tom Brady Deflategate

    The Deflategate scandal erupted following the 2014 AFC...
    Measurement
    By: Greg Cenker and Henry Zumbrun
Manage My Account
  • eMagazine Subscriptions
  • Newsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Quality audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Quality or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • This image shows a person seated next to a Bobcat T66 compact track loader.
    Sponsored byPolyWorks by InnovMetric

    Supercharging Digital Gauging at Bobcat North America

  • Dorsey Calibration Lab photo by Tom LaBarbera Picture this Studios
    Sponsored byDorsey Metrology International

    Ensuring Product Quality in a Competitive Manufacturing Landscape

  • This image displays a Eddyfi Technologies Cypher portable inspection instrument alongside a scanner for non-destructive testing (NDT).
    Sponsored byEddyfi Technologies

    A Safer, Smarter Approach to Weld Inspection: Why Advanced Ultrasonic Testing Is Redefining Industry Standards

Popular Stories

MicroRidge MobileCollect wireless measurement system

Before AI Can Help, the Data Has to Be Ready

a titanium diaphragm speaker driver

The One Thing Elon Gets Right Is Designed to Scare You

This image shows a person seated next to a Bobcat T66 compact track loader.

Supercharging Digital Gauging at Bobcat North America

2026 Quality Professional of the Year!

Events

June 4, 2026

Scaling Manufacturing Quality with Automation for Greater ROI

If you need to do more with the same resources or build a new tech foundation, this session shows where to start and how to create a more efficient, scalable, cost-conscious quality process.

June 9, 2026

Future-Proof your Quality Processes with Advanced 3D Optical CMM Technology

Discover how to effortlessly capture complex data, leverage true multi-sensor automation, and ensure continuous operation without creating inspection delays.

View All Submit An Event

Products

Lean Manufacturing and Service Fundamentals, Applications, and Case Studies

Lean Manufacturing and Service Fundamentals, Applications, and Case Studies

See More Products
Quality Podcast Channel Custom Content

Related Articles

  • Quality Software & Analysis: Beat the Shop Floor Environment

    See More
  • the logo for KOBA – Kolb und Baumann

    CMM Technology on the “Shop Floor”? Why Not!

    See More
  • robots

    The Latest Trends on the Shop Floor

    See More

Related Products

See More Products
  • Lean Manufacturing for the Small Shop, 2nd Edition

  • A Primer on the Taguchi Method, 2nd Edition

  • certified.jpg

    The Certified Software Quality Engineer Handbook, Second Edition

See More Products

Events

View AllSubmit An Event
  • May 20, 2026

    Break the Bottleneck: Bringing Lab-Grade Accuracy to the Shop Floor

    On Demand Are you struggling to deliver high-quality products faster in the face of growing complexity and a shrinking pool of skilled workers?
  • August 12, 2025

    Enhancing Shop Floor Metrology: The Case for 3D Optical Gauges in Quality Management

    On Demand This webinar will discuss how 3D optical gauges can help you qualify and quantify your inspection callouts, defects, geometries of interest, and surface finish in seconds – right on the shop floor.
View AllSubmit An Event
×

Stay in the know with Quality’s comprehensive coverage of
the manufacturing and metrology industries.

Newsletters | Website | eMagazine

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Manufacturing Division
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Market Research
    • Reprints
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing