Quality Magazine logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Quality Magazine logo
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
    • SUBMIT YOUR PRODUCT
  • CHANNELS
    • AUTOMATION
    • MANAGEMENT
    • MEASUREMENT
    • NDT
    • QUALITY 101
    • SOFTWARE
    • TEST & INSPECTION
    • VISION & SENSORS
  • MARKETS
    • AEROSPACE
    • AUTOMOTIVE
    • ENERGY
    • GREEN MANUFACTURING
    • MEDICAL
  • MEDIA
    • A WORD ON QUALITY PUZZLE
    • EBOOK
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • EVENTS
    • EVENT CALENDAR
    • IMTS
  • DIRECTORIES
    • BUYERS GUIDE >
      • Supplier Insights
    • NDT SOURCEBOOK
    • VISION & SENSORS
    • TAKE A TOUR
  • INFOCENTERS
    • Digital Quality Management Systems
    • NEXT GENERATION SPC & QUALITY ANALYTICS
  • AWARDS
    • ROOKIE OF THE YEAR
    • PLANT OF THE YEAR
    • PROFESSIONAL OF THE YEAR
  • MORE
    • Expert Columns
    • NEWSLETTERS
    • QUALITY STORE
    • INDUSTRY LINKS
    • SPONSOR INSIGHTS
  • EMAG
    • eMAGAZINE
    • ARCHIVES
    • CONTACT
    • ADVERTISE
  • SIGN UP!

Quality Management: Six Sigma: Maximize the Benefits

October 1, 2005
Reinstituting long-forgotten elements of the original Six Sigma initiative increases profitability and improved margins.

To be successful, Six Sigma initiatives must be strategy driven, process focused and project enabled. Originally, Motorola designed a Six Sigma methodology with the goal of improving an organization's margins-quality and efficiency improvements were the byproducts. The methodology and discipline of Six Sigma incorporated and integrated the strategy, process and project elements. Unfortunately, as Six Sigma has evolved during the past two decades, several of the elements of the original methodology have been dropped. Therefore, many current initiatives are not driven by organizational strategy with an emphasis on profitability. Thus, the projects selected that do not meet the Six Sigma criteria are not given the support needed to achieve the expected benefits and take much longer than originally intended. As Mikel Harry states in his book, Six Sigma: The Breakthrough Management Strategy, "Organizations that can't track effective quality improvements on profitability don't know what changes need to be made to improve their profit margins."



Six Sigma: The current reality

As Six Sigma initiatives have been embraced by more and more organizations, two areas of the original Six Sigma methodology and discipline have been compromised. These are the initial and concluding phases of the methodology and the role of top management, particularly the Champion, in the selection and support of the projects.

The table, "Motorola's Six Sigma Methodology," describes the purpose of each phase of Motorola's original Six Sigma methodology. As it is presented in most training courses or books today, the Six Sigma methodology does not include all of Motorola's original phases or their intent.

Current applications of the Six Sigma methodology emphasize the phases that are integral to conducting a project. These are Define, Measure, Analyze, Improve and Control, or DMAIC, and guide the project team in its work under the leadership of a Black Belt or Green Belt. The critical phase of Recognize, which is key to selecting projects tied to strategic goals, rarely is mentioned. Also, the Sustain and Institutionalize phases rarely are discussed as part of the Six Sigma methodology. All three of these phases belong to the Champion who owns the project.

As a result, many projects are launched without a tie to the company's strategic goals. Once the project is completed, there is often confusion as to how to institutionalize the results. Some Six Sigma project teams recognize these missing pieces and attempt to expand the control phase to include activities critical to sustaining and institutionalizing the gains they have made.

However, a Six Sigma project team cannot accomplish these last two phases without the Champion's involvement and accountability. If the Champion is missing in action, the project team may simply stop with the Control phase. Some benefits may be achieved for the short term, but the long-term results will be undermined.

In a rush to show some activity in the Six Sigma arena, projects are selected without sufficient consideration of the strategic goals of the organization. Project teams are set up with a Black Belt or Green Belt leading the effort, but the project is not strategically focused and the team members cannot find sufficient time to work on the project. These projects take longer than companies have been led to believe and the results do not always meet expectations.

What is missing is the structure that made Six Sigma so successful when it began; that is, the discipline of the original methodology which ensured that projects would be selected according to strategic goals and that project ownership would rest with the Champion. A comparison of the Ideal Initiative and the Current Reality for Six Sigma is shown in the table, "Accessing a Company's Six Sigma Initiative."

If a Six Sigma effort is similar to the current reality column in the table, projects are not likely to be as successful as a company wishes, nor the results sustained over time. However, it is possible to refocus and get back on the ideal track.

To do a quick assessment of an organization's current Six Sigma effort, give a point score to each item in the table. Score a 5 if achieving the Ideal Initiative and a 1 if at the Current Reality. For a status that is in between these two categories, give the organization a score that is between a 1 and a 5.

The maximum score for the 13 areas is 65. If an organization's score is 50 or above, it is on the right track. For scores between 30 and 49, identify the areas that score lowest and refocus the efforts on these. If the score is less than 30, an organization should refocus its Six Sigma effort beginning with the strategic goals.



Refocusing the Six Sigma initiative

The first step in refocusing a Six Sigma initiative is to ensure that it is strategy driven. Top management must lead a Six Sigma initiative to achieve future business success. If the top management of an organization has not been trained in Six Sigma, this is the place to start.

Once the organization's leadership understands what is required of them, they can select and charter projects that are connected to the organization's strategic goals. This is the work of the Recognize phase of the methodology. Projects are selected according to the following criteria:

• Provides a direct link to strategic business goals.

• Directly impacts key business objectives.

• Contributes to bottom-line

performance.

• There are direct benefits to

key customers.

• There are direct benefits to

the organization.

• Can be accomplished in a six-month time frame.

Once the project is selected according to the criteria, a charter is created by the Champion and Black or Green Belt to guide the project team.

The next step is to set up the project teams with appropriate support. The project Champion owns the project and has a critical role to play in providing support for the project team as the project moves forward. The Black Belt or Green Belt leading the team must work closely with the project Champion and ask for help as needed. As part of the project team set up, the project charter can include time requirements for all team members and clear permission from all managers to support these time commitments.

For every Six Sigma project, there is a process involved. It is this process that ultimately determines the quality of the product or service to be improved. Improvement is accomplished by making changes in the process to achieve higher quality. Before such changes can be made successfully, it is critical to understand why the current process delivers the current level of quality. The Define, Measure and Analyze phases of the Six Sigma methodology are specifically designed to achieve this process understanding. This is the initial work of the Six Sigma project team after their project has been chartered.

Once a process is understood, the insights can be directed to possible ways to improve the process, and subsequently, the product or service. This is the purpose of the Improve phase. After various process changes have been tried and evaluated, the best ones are selected to implement, thereby creating a new process.

In the Control phase, the project team writes procedures for the new process, conducts training for all employees and develops a response plan to follow if something changes for the worse. When the process owners take over and run the new process according to the control and response plans developed by the project team, this is the essence of the Sustain phase of the project.

The Institutionalize phase focuses on any and all organizational systems and structures that need to be changed to support the newly improved process.

These last two phases are not the responsibility of the project team. They are the responsibility of the project Champion and the process owners. The Six Sigma project team focuses on improving a process in a project format, but the long-term success must be achieved by process owners using the improvements successfully.



Maximizing the benefits

After the Six Sigma initiative becomes strategy driven and the full methodology and discipline are in operation, the foundation is in place to achieve the maximum success from each Six Sigma project. Projects will be selected according to criteria that ensure they have an impact on the organization's strategic goals. The support will be in place for project teams to complete their work in a timely manner with process changes that can be sustained and institutionalized. These strategically selected projects can then accomplish the real goal of Six Sigma-profitability and improved margins. Q



Sophronia W. Ward, Ph.D. and Sheila R. Poling are managing partners at Pinnacle Partners Inc. (Oak Ridge, TN). For more information, call (865) 482-1362 or visit www.pinnaclepartnersinc.com.

Quality Tech tips

• As more organizations embrace Six Sigma initiatives, several areas of the original methodology have been compromised: the initial and concluding phases of the methodology and the role of top management.

• Many projects are launched without a tie to the company's strategic goals.

• If the Champion is "missing in action," some benefits may be achieved for the short term, but long-term results will be undermined.

• Top management must lead a Six Sigma initiative to achieve future business success.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2024 Quality Rookie of the Year Justin Wise 1440x750px banner with "Quality Rookie of the Year" logo inset

    Meet the 2024 Quality Rookie of the Year: Justin Wise

    Justin Wise is an exceptional individual who has been...
    Aerospace
    By: Michelle Bangert
  • Man with umbrella and coat stands outside while it rains at night looking at a building.

    Nondestructive Testing: Is there an ethics problem?

    I was a whistleblower who exposed fraudulent activities...
    NDT
    By: Dale Norwood
  • Unraveling Deflategate: Football stadium with closeup of football on field

    Unraveling the Tom Brady Deflategate

    The Deflategate scandal erupted following the 2014 AFC...
    Measurement
    By: Greg Cenker and Henry Zumbrun
Manage My Account
  • eMagazine Subscriptions
  • Newsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Quality audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Quality or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Key Takeaways for Quality Leaders
    Sponsored byComplianceQuest

    Key Takeaways for Quality Leaders from the 2026 Gartner Magic Quadrant™ for QMS

  • This image shows a person seated next to a Bobcat T66 compact track loader.
    Sponsored byPolyWorks by InnovMetric

    Supercharging Digital Gauging at Bobcat North America

  • Dorsey Calibration Lab photo by Tom LaBarbera Picture this Studios
    Sponsored byDorsey Metrology International

    Ensuring Product Quality in a Competitive Manufacturing Landscape

Popular Stories

a titanium diaphragm speaker driver

The One Thing Elon Gets Right Is Designed to Scare You

This image shows a person seated next to a Bobcat T66 compact track loader.

Supercharging Digital Gauging at Bobcat North America

Dorsey Calibration Lab photo by Tom LaBarbera Picture this Studios

Ensuring Product Quality in a Competitive Manufacturing Landscape

2026 Quality Professional of the Year!

Events

June 9, 2026

Future-Proof your Quality Processes with Advanced 3D Optical CMM Technology

Discover how to effortlessly capture complex data, leverage true multi-sensor automation, and ensure continuous operation without creating inspection delays.

June 22, 2026

Automate 2026

Automate is North America's largest robotics and automation event — and the best place to take your ideas from insight to impact.
 
Our show floor features the world’s leading automation solutions, from AI and robotics to motion control, vision systems, and more. Plus, our educational conference is second to none, led by the brightest minds in automation today.
 
Ready to transform the way you work? Take the next step at Automate.
View All Submit An Event

Products

Lean Manufacturing and Service Fundamentals, Applications, and Case Studies

Lean Manufacturing and Service Fundamentals, Applications, and Case Studies

See More Products
Quality Podcast Channel Custom Content

Related Articles

  • Quality Management: Six Sigma and Management

    See More
  • Quality Management: Six Sigma's Seven Deadly Sins

    See More
  • Quality Management: Strengthen the Six Sigma Portfolio

    See More

Related Products

See More Products
  • leaner.jpg

    Leaner Six Sigma: Making Lean Six Sigma Easier and Adaptable to Current Workplaces

  • 9781260121827_22.jpg

    The Six Sigma Handbook, 5th Edition

  • Lean Six Sigma for Supply Chain Management, Second Edition

See More Products

Related Directories

  • Six Sigma Concepts LLC

    Six Sigma Concepts manufactures the Discovery stand-alone metrology system and ORION 100% sorting systems which come with a flat or tilted platen. Our systems are accurate to within .0001". and can be used right on the shop floor. Our InGage Software can tackle threads and non-symmetrical features too!
×

Stay in the know with Quality’s comprehensive coverage of
the manufacturing and metrology industries.

Newsletters | Website | eMagazine

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Manufacturing Division
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Market Research
    • Reprints
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing