Quality Magazine
  Home
  Subscribe
  Subscribe to eNewsletter
  Subscription Customer Service
  Online
  Industry Headlines
  eXtras
  Blogs
  Quality Product Spotlights
  White Papers on the Web
  Tech ManufactureXPO
  Quality Downloads
  Webinars
  Quality Showcases
  e-Inserts Plus
  Online Store
  More Product Info
  Archive
  Q-Tube
  Q-Cast Podcasts
  Quality Showrooms
  Brain Teasers
  Current Issue
  Coming Events
  Features
  Departments
  Columns
  Products
  Quality Quick Clicks
  Special Sections
  NDT
  Vision & Sensors
  Aerospace
  How To Guide
  China Editions
  Quality Guides
  Quality Buyers Guide
  Software Selector
  Registrars Guide
  Services Guide
  Quality Services
  Job Marketplace
  Industry Links
  Classifieds
  Career Center
  Events
  Quality Expo 2012
  IMTS 2012
  Meetings and Shows
  Industry Webinars
  Quality Awards
  2012 Quality Plant of the Year Nomination Form
  2012 Quality Professional of the Year Nomination Form
  Quality Leadership 100
  Quality Info
  Media Planning Guide
Search in: EditorialProductsCompanies
Too Many Copies
by William Patton
February 26, 2010

ARTICLE TOOLS
EmailEmailPrintPrintReprintsReprintsshareShare

Enlarge this picture
Source: James P. Hohner Jr.
A flowchart provides a solution to the problem by providing a master process. 


A quality tale as told to me....

A quality manager, who was a diehard flowcharter, went to work for a small startup corporation that did software duplication for client companies. As an added sales point, the software engineers of his firm developed and marketed a varied tableau of software protection schemes to add both value and protection to the duplicated program disks to ensure future clients that their work would not be subjected to misuse or theft.

When the quality manager joined the company, they had already installed marketing, engineering and sales departments and had already completed much of the required marketing and technical research to get us started. He was brought in to create and staff the production and quality control departments.

About a month into this brave new world, they finally made their first sale—700 program disks, with copy protection, for a young company in California’s Silicon Valley. All went right with the plans of marketing, engineering, production and quality—they completed and shipped the job on time and felt a lot of pride in these accomplishments.

Then the whole production run began unraveling. The client called and informed these young upstarts that they had duplicated the wrong version of the client’s program. The version that had meandered throughout the newly formed company and ultimately vested itself into the final product was a version that was five levels down from the client’s final version.

I listened intently as I tried to imagine the methods that this manager would use to flush out the guilty process or person. He interviewed all of the people about the events; everyone’s answer was a question of total disbelief: “How could we have gotten a wrong copy of the master?” Three of the people showed him the “master” copy that they had. Only then did it begin to dawn on him that they all had their hands on a “master copy.”

Then he asked who would ever allow more than one master copy of anything? In his world that is completely impossible. There is only one master copy. What had he gotten himself into?

This was turning into an interesting detective story. I was sitting right here with a real-world corporation detective.

He then went to engineering and asked for a flowchart of the mastering process. There was no such flowchart—the fact that there also were no other flowcharts did not scare him at that moment.


Mastering process

Enlarge this picture
Source: Patton & Patton Software Corp.
Since there was no flowchart, the quality manager mused, then there was no mastering process. After putting together some preliminary flowcharts that would help develop a “gold” standard and a “silver” secondary level that would be used for production and quality, he asked for and received permission from his boss to get to the bottom of this “process” problem.

He called an emergency staff meeting and asked that marketing and engineering bring to the meeting any and all customer masters. This was monumentally revealing when there appeared 10 items called masters spread out on their conference table.

It took a good 20 minutes for him to relate how the meeting progressed and how he talked with the department heads and was assured that the disks they had brought to the meeting were, indeed, “customer masters.” He said it took almost two hours to tell them, show them, preach to them, warn them and finally convince them that there could only be one customer master and it had to be kept in a controlled safe.

As they began to understand all of this malarkey about gold and silver, they began to realize that they absolutely did not own a customer master—in truth, they actually owned 10 customer masters. And the worst news of all—these 10 disks were all different. He said he found a copy of the customer’s last version and also a copy of the master they had used for duplication, both in the pile.

In the badly drawn flowchart, “Duplicating the First Order,” it can be seen that essentially all departments worked with the customer on all levels, and it turned out that the company owner interacted with his own quality department in ways that precluded getting a single master out of the client company into the other company’s hands.<


Enlarge this picture
Source: Patton & Patton Software Corp.
Once in the hands of the duplication company, the same problems existed—a bunch of interactions and no controls on the mastering process. If the engineering department needed another copy of the master, they went to the customer. If production needed another copy, and engineering was not available, they could go to marketing and get another disk. He told me that all of these facts surfaced during the interviews.

Then, with emphasis, the quality manager related that a system like this simply cannot exist in a manufacturing or service company—a system where everyone is in charge and everyone thinks he is the responsible manager or agent.

The quality manager laughingly stated they should adopt a name for an organization based on 0 planning and 0 control—it should be called an “Oh” system—and the only output is the circle of constant fixing, constant repairing, constant yelling and spiraling costs.

See his first draft of a flowchart to develop some control, “First Step to Creating a Real Gold Mastering Standard.”

Now he was on a roll, and followed with a profound statement: “The people involved with this problem, all fairly well-trained professionals, and good at their jobs, just were never exposed to the precision that is offered by a good flowchart.” He said that once they learned this about flowcharts they were unstoppable.

In these types of control several key points must be understood:

Master a gold copy from the customer.

Have working copies of the gold called silvers.

The customer must see, test and approve a copy of the master (spelled silver).

Production and quality must have copies of the gold (again, spelled silver).

Have a master and a backup master on file (Gold xx.00 and xx.01)

In the final flowchart (See “Gold Mastering Process”), notice that the quality manager actually put in a noted process that would let someone admit that he had an extra gold. And, the chart tells one what to do in this instance. Q


Tech tips

  • Process mapping is a technique that identifies the world of a process.
  • A flowchart can communicate an intricate process between different levels of knowledge, training and abilities.
  • Flowcharts help visualize a process, making it easier to communicate those processes, understand those processes and to ensure that things are not missed.


William Patton
William Patton is president of Patton & Patton Software Corp. (Oro Valley, AZ). For more information call (520) 638-8738 e-mail pattonsr@patton-patton.com or visit www.patton-patton.com.

|PrintEmail

Did you enjoy this article? Click here to subscribe to the magazine.




























Most Emailed Articles

  1. Management: A Closer Look: Understanding Risk Management for Medical Device Manufacturers
  2. Other Dimensions: Does New Stuff Have to be Calibrated?
  3. Auto Industry Goes on U.S. Hiring Binge
  4. Jim’s Gems: Don’t Focus on What Seems Unfair
  5. GD&T Workshop: A Top Down View
  6. Understanding ISO 13485
  7. Test & Inspection: Sensing the Thread
  8. Software & Analysis: FMEAs for the Medical Industry: Which FMEA Type Should I Use?
  9. Shifting the Paradigm: Business System Analyses for Identifying Areas to Improve
  10. ISO 13485: Medical Devices and Risk Management
Top Searches
  1. Quality 101
  2. Quality Management Systems
  3. quality assurance
  4. quality inspector
  5. quality performance indicators
  6. LEAN Quality Management Systems
  7. surface finish
  8. root cause
  9. variation management
  10. optical inspection
 
Most Popular Articles
  1. Other Dimensions: Does New Stuff Have to be Calibrated? 01/31/2012
  2. Quality 101: Nondestructive Testing 02/22/2008
  3. Quality 101: An Introduction to Gage R&R 12/01/2005
  4. Understanding ISO 13485 01/02/2008
  5. 50 Years of Quality--Take Another Look at Nondestructive Testing 10/23/2011
  6. Measurement: The Democratization of Measurement 01/27/2012
  7. Aerospace Industry To Face Challenges in 2012 02/07/2012
  8. Quality Measurement: Effects of Screw-Thread Geometry 10/01/2005
  9. U.S. Manufacturing Making a Comeback 02/01/2012
  10. Quality 101: Surface Finish Measurement Basics 09/01/2004
© 2010 BNP Media. All rights reserved. | Privacy Policy