Quality Magazine logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Quality Magazine logo
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
    • SUBMIT YOUR PRODUCT
  • CHANNELS
    • AUTOMATION
    • MANAGEMENT
    • MEASUREMENT
    • NDT
    • QUALITY 101
    • SOFTWARE
    • TEST & INSPECTION
    • VISION & SENSORS
  • MARKETS
    • AEROSPACE
    • AUTOMOTIVE
    • ENERGY
    • GREEN MANUFACTURING
    • MEDICAL
  • MEDIA
    • A WORD ON QUALITY PUZZLE
    • EBOOK
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • EVENTS
    • EVENT CALENDAR
    • IMTS
  • DIRECTORIES
    • BUYERS GUIDE >
      • Supplier Insights
    • NDT SOURCEBOOK
    • VISION & SENSORS
    • TAKE A TOUR
  • INFOCENTERS
    • Digital Quality Management Systems
    • NEXT GENERATION SPC & QUALITY ANALYTICS
  • AWARDS
    • ROOKIE OF THE YEAR
    • PLANT OF THE YEAR
    • PROFESSIONAL OF THE YEAR
  • MORE
    • Expert Columns
    • NEWSLETTERS
    • QUALITY STORE
    • INDUSTRY LINKS
    • SPONSOR INSIGHTS
  • EMAG
    • eMAGAZINE
    • ARCHIVES
    • CONTACT
    • ADVERTISE
  • SIGN UP!

Other Dimensions: Calibration Report Details

By Hill Cox
January 2, 2008

In my last column I noted how some calibration laboratories offer what appear to be cheap calibration ‘reports.’ I showed how this is done-usually by doing less work and reporting little data. While ISO 17025 lists the basic information a calibration report should contain, there are many laboratories that play fast and loose with these requirements, particularly those not accredited to the standard.

I also urged folks who use outside sources for their calibration to get a list of the elements that will be inspected and reported in order to make a proper comparison between competing facilities. Or ask for copies of reports a lab has issued for the types of items you’re thinking of sending them with the recipient’s name blocked out to maintain confidentiality.

This will give you a better picture of what you will get for your money. Here are some of the elements that are often misrepresented or omitted:
  • Accreditation. Is it meaningful? Anyone can go around accrediting laboratories-in fact, there’s one company I know of that will take care of the whole thing by mail. If mail-order accreditation gives you a warm fuzzy feeling, go for it. On second thought, would you let someone drive your car if they got their driver’s license that way?

  • Traceability. This does not have to be shown on the report if the laboratory has been properly accredited to comply with ISO 17025. But if the laboratory isn’t, I would want to see the actual report from whoever calibrated their primary or working standards.

  • Data. Are you being short-changed? On plug and ring gages there should be a minimum of three readings on go gages and two on no-go gages.

  • Is the report a product of measurements actually carried out by the company that issued it or did they subcontract the work? If they did, check out the subcontractor.

  • Are recalibration dates shown? If the answer is yes, find out who assigned them. If it’s the laboratory, they don’t comply with ISO 17025. Only the owner of the items being calibrated has adequate information to make such a call.

  • Uncertainty. The report should show the uncertainty for each measurement made. And that uncertainty should be shown in the units of measurement shown on the report. Motherhood statements claiming it to be within a certain ratio is not of much use for dimensional work. Check the uncertainty against the tolerances involved to ensure the lab has at least some chance providing a meaningful measurement.

  • Tolerances. If tolerances are shown, somewhere in the report it should be noted whether they apply to new or used gages or numbers pulled out of the air. New product tolerances may be shown for comparison purposes but should be noted as such. Only the gage owner can determine what tolerance is acceptable for their applications.

  • Accept/Reject. If the report has declarations regarding acceptability of the item calibrated, I would want to know what criteria was used or where it came from if it is shown on the report. If the answer is the new gage specifications, you could be discarding perfectly useable gages. I also would ask the laboratory how they treat their measurement uncertainty when making such statements. Do they reject an item based on their reading of size and ignore their uncertainty?
Under ISO 17025 a calibration report that does not show actual values but simply lists a description of the gage and indicates it is within a stated specification is acceptable. But the issuing laboratory must keep all the data from its measurements of the gage on file. And they must indicate if they did not check all of the elements called for in the specification by noting what they did or didn’t measure. If this was not done, the customer would assume that all elements were measured-often this is not the case. If you accept such statements in lieu of data, you should confirm what was measured to be safe.

These are some of the basics you should know about. If you don’t, a sharp quality auditor may discover details on reports that are suspect, or details that should be in reports but are not.

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Hill Cox is the chairman for the technical committee for the American Measuring Tool Manufacturers Association and president of Frank Cox Metrology Ltd. He can be reached at [email protected] or at 905-457-9190. 

Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2024 Quality Rookie of the Year Justin Wise 1440x750px banner with "Quality Rookie of the Year" logo inset

    Meet the 2024 Quality Rookie of the Year: Justin Wise

    Justin Wise is an exceptional individual who has been...
    Aerospace
    By: Michelle Bangert
  • Man with umbrella and coat stands outside while it rains at night looking at a building.

    Nondestructive Testing: Is there an ethics problem?

    I was a whistleblower who exposed fraudulent activities...
    NDT
    By: Dale Norwood
  • Unraveling Deflategate: Football stadium with closeup of football on field

    Unraveling the Tom Brady Deflategate

    The Deflategate scandal erupted following the 2014 AFC...
    Measurement
    By: Greg Cenker and Henry Zumbrun
Manage My Account
  • eMagazine Subscriptions
  • Newsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Quality audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Quality or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Key Takeaways for Quality Leaders
    Sponsored byComplianceQuest

    Key Takeaways for Quality Leaders from the 2026 Gartner Magic Quadrant™ for QMS

  • This image shows a person seated next to a Bobcat T66 compact track loader.
    Sponsored byPolyWorks by InnovMetric

    Supercharging Digital Gauging at Bobcat North America

  • Dorsey Calibration Lab photo by Tom LaBarbera Picture this Studios
    Sponsored byDorsey Metrology International

    Ensuring Product Quality in a Competitive Manufacturing Landscape

Popular Stories

a titanium diaphragm speaker driver

The One Thing Elon Gets Right Is Designed to Scare You

This image shows a person seated next to a Bobcat T66 compact track loader.

Supercharging Digital Gauging at Bobcat North America

Dorsey Calibration Lab photo by Tom LaBarbera Picture this Studios

Ensuring Product Quality in a Competitive Manufacturing Landscape

2026 Quality Professional of the Year!

Events

June 9, 2026

Future-Proof your Quality Processes with Advanced 3D Optical CMM Technology

Discover how to effortlessly capture complex data, leverage true multi-sensor automation, and ensure continuous operation without creating inspection delays.

June 22, 2026

Automate 2026

Automate is North America's largest robotics and automation event — and the best place to take your ideas from insight to impact.
 
Our show floor features the world’s leading automation solutions, from AI and robotics to motion control, vision systems, and more. Plus, our educational conference is second to none, led by the brightest minds in automation today.
 
Ready to transform the way you work? Take the next step at Automate.
View All Submit An Event

Products

Lean Manufacturing and Service Fundamentals, Applications, and Case Studies

Lean Manufacturing and Service Fundamentals, Applications, and Case Studies

See More Products
Quality Podcast Channel Custom Content

Related Articles

  • Other Dimensions: Calibration--You Get What You Pay For

    See More
  • Other Dimensions: Calibration Ingredients

    See More
  • Other Dimensions: Calibration Mistakes: Plain Plug Gages

    See More

Related Products

See More Products
  • The Quality Calibration Handbook

See More Products
×

Stay in the know with Quality’s comprehensive coverage of
the manufacturing and metrology industries.

Newsletters | Website | eMagazine

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Manufacturing Division
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Market Research
    • Reprints
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing