Quality Magazine logo
search
cart
facebook twitter linkedin youtube
  • Sign In
  • Create Account
  • Sign Out
  • My Account
Quality Magazine logo
  • NEWS
  • PRODUCTS
    • FEATURED PRODUCTS
    • SUBMIT YOUR PRODUCT
  • CHANNELS
    • AUTOMATION
    • MANAGEMENT
    • MEASUREMENT
    • NDT
    • QUALITY 101
    • SOFTWARE
    • TEST & INSPECTION
    • VISION & SENSORS
  • MARKETS
    • AEROSPACE
    • AUTOMOTIVE
    • ENERGY
    • GREEN MANUFACTURING
    • MEDICAL
  • MEDIA
    • A WORD ON QUALITY PUZZLE
    • EBOOKS
    • PODCASTS
    • VIDEOS
    • WEBINARS
  • EVENTS
    • EVENT CALENDAR
    • THE QUALITY SHOW
    • IMTS
  • DIRECTORIES
    • BUYERS GUIDE >
      • Supplier Insights
    • NDT SOURCEBOOK
    • VISION & SENSORS
    • TAKE A TOUR
  • INFOCENTERS
    • Digital Quality Management Systems
    • NEXT GENERATION SPC & QUALITY ANALYTICS
  • AWARDS
    • ROOKIE OF THE YEAR
    • PLANT OF THE YEAR
    • PROFESSIONAL OF THE YEAR
  • MORE
    • Expert Columns
    • NEWSLETTERS
    • QUALITY STORE
    • INDUSTRY LINKS
    • SPONSOR INSIGHTS
  • EMAG
    • eMAGAZINE
    • ARCHIVES
    • CONTACT
    • ADVERTISE
  • SIGN UP!
NDT

ASNT Column | Muriel D. Magloire

Behind the Scenes, Behind Schedule: NDT’s Workforce Shortage

This isn’t just an industry problem—it’s a public safety issue.

By Muriel D. Magloire
Shot of Three Engineers Walking Through a Heavy Industry Manufacturing Factory. In the Background Welding Work in Progress, Various Metalwork, Pipeline/ Barrel Components.

Image Source: gorodenkoff / iStock / Getty Images Plus

May 1, 2025

Behind every successful infrastructure project, safe flight, or energy facility lies an unsung hero—Nondestructive Testing(NDT) professionals. We are the last line of defense before a pipeline goes online, before a bridge reopens to traffic, or before a turbine takes its first spin. We ensure that what appears sound on the outside truly holds up under pressure. Yet beneath the surface of our own industry lies a critical issue—a growing workforce shortage that threatens not just our profession, but public safety and progress itself. In an industry where safety is everything, that’s not a risk we can afford.

The talent gap in NDT is no longer a looming challenge, it’s already here. This isn’t just an industry problem—it’s a public safety issue. According to a 2023 report from the American Society for Nondestructive Testing (ASNT), nearly 30% of certified NDT personnel are over the age of 55, and retirements are accelerating. At the same time, fewer people are entering the field. This trend is especially concerning given the essential nature of our work in aerospace, oil and gas, transportation, nuclear energy, and beyond. A shortage in qualified inspectors can mean project delays, increased costs, and, most critically, compromised safety. I see the effects of this firsthand in my own work. Our teams are stretched thin. New inspectors are hard to find—and even harder to retain. While many of us are proud to work long shifts to meet demand, we can’t overlook the need for reinforcements. We need to start thinking long-term.

READ MORE

  • Nondestructive Testing for Additive Manufacturing 
  • Unethical Decisions in NDT 
  • Nondestructive Testing Certification Mandatory for Individuals

One major contributing factor is lack of visibility. The average high school graduate has never heard of NDT. Furthermore, NDT isn’t part of mainstream career conversations, and despite its importance, we haven’t done enough to promote it as a viable, respected career path. As a result, we miss out on the curiosity and ambition of talented individuals who might thrive in this field if only they knew it existed.

Another issue lies in perception. From the outside, NDT looks like a technical, blue-collar job with limited growth. But those of us in the field know better. This work demands critical thinking, attention to detail, and technical expertise. It offers opportunities to travel, to lead, and to make real-world impacts. I’ve personally inspected components that support massive public projects, and knowing that my work directly contributes to safety is a responsibility I take seriously. It’s a point of pride.

Let’s address the pink elephant in the room and talk about the importance of work culture. The NDT industry, like many technical trades, has historically lacked diversity. To attract and retain the next generation, we need to create a work environment that is not just technically rigorous, but also inclusive, supportive, and forward-thinking. For many younger workers, especially Millennials and Gen Z, careers need to offer more than a paycheck. They’re looking for purpose, growth, and a healthy work culture. If we want them in our ranks—and we should—we need to offer all three. According to Deloitte’s 2023 Global Human Capital Trends report, companies with inclusive cultures are twice as likely to meet or exceed financial goals, six times more likely to be innovative, and eight times more likely to achieve better business outcomes. These aren't just feel-good ideas, they're strategic advantages.

The average high school graduate has never heard of NDT.

Fortunately, some progress is being made. Industry organizations like ASNT and the Nondestructive Testing Management Association (NDTMA) are stepping up with scholarships, outreach efforts, and campaigns to raise awareness. We need to bring NDT into high school classrooms and vocational training centers. We need to mentor early-career techs and support pathways for certification that don’t require massive financial sacrifice. We need leadership to recognize that technical skill and cultural awareness can and should coexist.

I believe the future of NDT is bright, but only if we act now to close this gap. Whether you’re a fellow inspector, a hiring manager, or just someone who cares about the integrity of our world’s infrastructure, your voice matters. Share what you know. Invest in the next generation. Be part of the shift. The strength of this industry has always come from its people. Let’s make sure we have enough of them to carry the torch forward. Behind every safe structure is someone who cared enough to inspect it—and someone who cared enough to train them.

KEYWORDS: American Society for Nondestructive Technology (ASNT) certification manufacturing metrology

Share This Story

Looking for a reprint of this article?
From high-res PDFs to custom plaques, order your copy today!

Muriel magloire

Muriel Magloire is a Level II Nondestructive Test Inspector currently working in the energy sector. She began her career supporting the U.S. Navy through the Department of Defense before transitioning into the private sector. With a goal of becoming a Level III and moving into aerospace, she is passionate about inclusive leadership, workforce development, and building the future of NDT—one inspection at a time.



Recommended Content

JOIN TODAY
to unlock your recommendations.

Already have an account? Sign In

  • 2024 Quality Rookie of the Year Justin Wise 1440x750px banner with "Quality Rookie of the Year" logo inset

    Meet the 2024 Quality Rookie of the Year: Justin Wise

    Justin Wise is an exceptional individual who has been...
    Aerospace
    By: Michelle Bangert
  • Man with umbrella and coat stands outside while it rains at night looking at a building.

    Nondestructive Testing: Is there an ethics problem?

    I was a whistleblower who exposed fraudulent activities...
    NDT
    By: Dale Norwood
  • Unraveling Deflategate: Football stadium with closeup of football on field

    Unraveling the Tom Brady Deflategate

    The Deflategate scandal erupted following the 2014 AFC...
    Measurement
    By: Greg Cenker and Henry Zumbrun
Manage My Account
  • eMagazine Subscriptions
  • Newsletters
  • Online Registration
  • Subscription Customer Service
  • Manage My Preferences

More Videos

Sponsored Content

Sponsored Content is a special paid section where industry companies provide high quality, objective, non-commercial content around topics of interest to the Quality audience. All Sponsored Content is supplied by the advertising company and any opinions expressed in this article are those of the author and not necessarily reflect the views of Quality or its parent company, BNP Media. Interested in participating in our Sponsored Content section? Contact your local rep!

close
  • Key Takeaways for Quality Leaders
    Sponsored byComplianceQuest

    Key Takeaways for Quality Leaders from the 2026 Gartner Magic Quadrant™ for QMS

  • This image shows a person seated next to a Bobcat T66 compact track loader.
    Sponsored byPolyWorks by InnovMetric

    Supercharging Digital Gauging at Bobcat North America

  • Dorsey Calibration Lab photo by Tom LaBarbera Picture this Studios
    Sponsored byDorsey Metrology International

    Ensuring Product Quality in a Competitive Manufacturing Landscape

Popular Stories

Aerospace engineer reviewing a digital twin model on a laptop beside an aircraft.

The Demand for Integrating Cybersecurity into Aerospace Quality

ISO 14001 graphic with sustainability, recycling, and carbon emissions icons over green grass.

ISO14001: 2026 is Published

Two quality auditors reviewing production records on a factory floor.

They Just Told Me I’m Going to Be the New Internal Auditor – YIKES! (Part 1)

2026 Quality Professional of the Year!

Events

August 12, 2026

Eliminate Manual FAI Processes and Reduce Inspection Time by Up to 90%

Discover how advanced FAI software automates First Article Inspection workflows by generating inspection plans, validating results in real time, integrating 2D/3D data, and reducing quality escapes to improve efficiency and compliance.

September 2, 2026

Reliably Increasing Efficiency in Aerospace Component Inspection through Robotics

Whether you're evaluating automation for a production line or exploring how to scale NDT capacity without scaling headcount, this session offers practical insight into where robotic ECA inspection delivers the most value.

View All Submit An Event

Products

Lean Manufacturing and Service Fundamentals, Applications, and Case Studies

Lean Manufacturing and Service Fundamentals, Applications, and Case Studies

See More Products
Rookie of the Year Custom Content

Related Articles

  • QualityHeadlines.jpg

    SME Announces New Initiative in Partnership with Community, Technical Colleges to Address Workforce Shortage, Skills Gap Crisis

    See More
  • Machine Vision Integration: Behind the Camera

    See More
  • The image displays an ultrasonic testing device used for non-destructive inspection.

    Modern Nondestructive Testing (NDT)

    See More

Related Products

See More Products
  • H1470.jpg

    The Certified Quality Improvement Associate Handbook, Third Edition

  • RFID: Tool Tracking Solutions DVD

  • Poka-Yoke: Mistake Proofing DVD

See More Products

Related Directories

  • TEST NDT LLC

    NDT Training Courses for the Aircraft Industry, consulting and Level III services. Methods include Ultrasonic, Phased Array, Eddy Current, Eddy Current Array, Radiography, Penetrant, Magnetic Particle and Visual. Scheduled and On-Site Training available. Call Cathy Harvey at (714) 255- 1500 for details or to discuss your options.
×

Stay in the know with Quality’s comprehensive coverage of
the manufacturing and metrology industries.

Newsletters | Website | eMagazine

JOIN TODAY!
  • RESOURCES
    • Advertise
    • Contact Us
    • Directories
    • Manufacturing Division
    • Store
    • Want More
  • SIGN UP TODAY
    • Create Account
    • eMagazine
    • Newsletters
    • Customer Service
    • Manage Preferences
  • SERVICES
    • Marketing Services
    • Market Research
    • Reprints
    • List Rental
    • Survey/Respondent Access
  • STAY CONNECTED
    • LinkedIn
    • Facebook
    • YouTube
    • X (Twitter)
  • PRIVACY
    • PRIVACY POLICY
    • TERMS & CONDITIONS
    • DO NOT SELL MY PERSONAL INFORMATION
    • PRIVACY REQUEST
    • ACCESSIBILITY

Copyright ©2026. All Rights Reserved BNP Media, Inc. and BNP Media II, LLC.

Design, CMS, Hosting & Web Development :: ePublishing